Basement

Ashford, CT Basement

Client wanted to finish their large 500 sq ft basement. The first thing we needed to accomplish was moving the washer & dryer to the other side of the basement. We then proceeded to finish this large space.

Materials used:

6 mil Plastic Sheeting – 1-1/2 in. R-7.5 Rigid Foam Board Insulation – 4″ OD, 11 Gauge Steel Building Column – 2 x 4 Framing Lumber, Pressure Treated for Bottom Plate – DMX 1-STEP 100 Underlayment – Wood Plank Laminate Flooring – 30″ Wall Mounted Electrical Fireplace – Cadet SoftHEAT Hydronic Heaters – 36″ Vanity with sink – 12″ x 24″ porcelain wall tile.

Watch the Walkthrough

 

  • Date

    March 1, 2023